GUARDConcrete Ltd
Call 647-710-2106

Concrete curbs and gutters

Curb and gutter formed and poured to municipal and project specifications, including OPSD details, for parking lots, plazas, roads and industrial sites.

Open 24 hours, 7 days a week · Mississauga and the GTA

What is included

  • Barrier curb, and curb with gutter
  • Depressed curbs at driveways, entrances and ramps
  • Parking lot islands and curb returns on tight radii
  • Removal and replacement of broken or plow-damaged sections
  • A compacted granular base under the curb
  • Contraction joints at the spacing specified, and expansion joints at catch basins and structures
  • Backfill and cleanup behind the curb

Line, grade and drainage

A curb does two jobs. It holds the edge of the pavement, and it steers water to the catch basins. If the gutter grade is off, water ponds, freezes, and breaks up the asphalt beside it. We set forms to the elevations on your drawings and check them before the pour.

We hand-form our curbs. That suits short runs, radii, staged work and repairs, the scopes that curb machines and larger contractors often pass on. On bigger sites we work stage by stage so traffic and deliveries keep moving.

Typical jobs

  • Replacing damaged curbs in plazas and parking lots
  • New entrances and curb cuts
  • Islands, walkway edges and loading areas
  • Curb and gutter along bus lanes and service roads

What affects the price

The length and profile of the curb, how many radii and depressed sections there are, removal of the old curb, and how the work has to be staged around traffic. Asphalt or sod restoration beside the curb is listed separately on your quote.

How a curb and gutter is built

The curb holds the edge and the gutter moves the water. Both depend on what is underneath.

ASPHALTBOULEVARD12345SECTION, NOT TO SCALE
  1. CurbHolds the edge of the pavement and keeps vehicles off the boulevard.
  2. GutterCarries water along the curb to the catch basin.
  3. Pavement edgeAsphalt is supported against the gutter, so it does not break away.
  4. Compacted granular baseStops the curb from settling or tipping.
  5. BackfillThe boulevard is filled and graded behind the new curb.

Thickness, concrete strength, joint spacing and slopes follow your project's drawings and specifications.

Questions about curbs and gutters

Short answers. Your quote covers the details for your site.

Can you replace one damaged section of curb?

Yes. We saw cut at the nearest joints, remove the section, and form the new curb to match the profile on either side.

Do you build to OPSD?

Yes. We build to the curb profile and details on your drawings, including the Ontario Provincial Standard Drawings.

Who gets the permit for a curb cut?

Work on the municipal road allowance needs the approval of the municipality. Your quote states who applies for it.

Where we do this work

We are based in Mississauga and work across the Greater Toronto Area. Pick your town for local details.

Request a quote

Tell us about the job and we will get back to you with a written quote. The service is already selected for you.

Prefer to talk? Call 647-710-2106 or email info@guardconcrete.com.

CallRequest a quote